Aluminum-Framed Storefront
Non-load-bearing aluminum storefront framing, including thermally broken systems, with 1-inch insulating glass and impact-rated assemblies for Florida HVHZ projects.
PART 1 GENERAL 1.1 SUMMARY A. Section includes commercial aluminum windows: fixed, single-hung, horizontal slider, casement, awning, projected, and double-hung configurations for commercial occupancies in Florida. 1.2 REFERENCES A. AAMA/WDMA/CSA 101/I.S.2/A440 — North American Fenestration Standard (NAFS). B. ASTM E283 — Standard Test Method for Determining Rate of Air Leakage. C. ASTM E330 — Standard Test Method for Structural Performance of Exterior Windows. D. ASTM E331 — Standard Test Method for Water Penetration of Exterior Windows. E. ASTM E1886 / E1996 — Impact Resistance (HVHZ). F. ANSI Z97.1 / 16 CFR 1201 — Safety Glazing. G. Florida Building Code 8th Edition; Miami-Dade NOA for HVHZ projects; Florida Building Code Energy Conservation (FBC-EC). 1.3 PERFORMANCE REQUIREMENTS A. Wind Load: Per ASCE 7-22 for project location and exposure category. B. Air Infiltration: ≤ 0.30 cfm/sf per ASTM E283 at 6.24 psf. C. Water Infiltration Resistance: No leakage at 15% of design pressure per ASTM E331, minimum 8 psf. D. Forced Entry Resistance: AAMA 1304 Grade 10 minimum. E. Impact Resistance (HVHZ): Large- and small-missile per ASTM E1886/E1996. F. Thermal Performance: U-factor and SHGC values per FBC-EC compliance method (prescriptive, performance, or energy modeling). G. Cycle Performance (operable): 4,000-cycle minimum life test per AAMA 920 (or equivalent) for hinged/sliding operating sash. 1.4 SUBMITTALS A. Product Data — manufacturer cut sheets for each window type, including profile dimensions, glass make-up, frame finish, and hardware. B. Shop Drawings — sealed by a Florida-licensed PE, showing window types, locations, glazing schedule, anchor patterns, and perimeter conditions. C. Florida Product Approval (FL PA) — current approval for each proposed window type and configuration. D. Miami-Dade NOA — for HVHZ projects, current Notice of Acceptance covering the specific tested configuration. E. Structural Calculations — project-specific anchor and member calculations sealed by a Florida-licensed PE. F. Thermal Performance Data — NFRC-certified U-factor, SHGC, VT, and condensation resistance. G. Glazing Schedule — full make-up by elevation including low-E coating type and surface position. H. Samples — frame corner section and operating hardware sample. I. Warranty — manufacturer's standard warranty plus installer warranty document. 1.5 QUALITY ASSURANCE A. Manufacturer: Holding current Florida Product Approval for proposed windows. B. Installer: Manufacturer-authorized, demonstrated minimum 5 commercial window installations of comparable scope. C. Mock-Up: For projects exceeding 50 commercial windows, provide a project-specific mock-up unit for performance verification prior to mass fabrication. PART 2 PRODUCTS 2.1 MANUFACTURERS A. Acceptable Manufacturers (basis of design): 1. ESWindows (Tecnoglass) — single-hung, horizontal slider, casement, projected, fixed. 2. PGT Industries — WinGuard Aluminum impact line. 3. Aldora Aluminum and Glass — architectural fixed, casement, awning, single-hung, mullions. B. Substitutions: Permitted only with prior approval; substituted product must carry current FL PA and (HVHZ) NOA documentation equivalent to basis of design. 2.2 SYSTEM A. Frame: Aluminum 6063-T5 or T6 extrusion with thermal break where required by FBC-EC. B. Glass: 1-inch insulating glass minimum. Laminated interlayer (0.090 in PVB or SGP) on the exterior lite for impact-rated assemblies. Heat-strengthened or tempered as required by code. C. Hardware: Stainless steel where exposed to coastal exposure; AAMA 901 forced-entry compliant. D. Sealants: Low-modulus silicone, AAMA 850 / 853 compliant; bond-compatible with adjacent substrates. E. Anchors: Stainless steel, sized per project-specific structural calculation. F. Finish: PVDF (Kynar 500) 2-coat or 3-coat, AAMA 2605 compliant; anodized class I per AAMA 611 acceptable as alternate. PART 3 EXECUTION 3.1 INSTALLATION A. Install per approved shop drawings, manufacturer instructions, and AAMA InstallationMasters guidelines. B. Verify rough opening is plumb, level, and square within manufacturer's tolerance prior to setting frame. C. Anchor per project-specific structural calculation. Do not deviate from approved anchor pattern. D. Install pan flashing and perimeter membrane per project water-management details. E. Seal perimeter with low-modulus silicone tooled to a concave joint profile. 1.6 DELIVERY, STORAGE, AND HANDLING A. Deliver materials in manufacturer's original, unopened, undamaged containers with identification labels intact. B. Store materials in a dry, ventilated location, off the ground, protected from weather, moisture, dust, and contact with dissimilar materials. Maintain factory-applied protective coverings until immediately prior to installation. C. Handle glass per GANA Glazing Manual Section 13. Reject and replace any unit with cracked, chipped, or scratched glass. Do not store glass in direct sunlight; cover with non-staining, opaque material if outdoor storage is unavoidable. D. Field-measure all openings prior to fabrication. Do not begin fabrication until field measurements are reconciled against shop drawings and recorded on the project Owner-Architect-Contractor (OAC) meeting log. 1.7 PROJECT CONDITIONS A. Field Measurements: Verify dimensions of structural openings and tolerances at perimeter conditions before fabrication. B. Existing Conditions: Coordinate with adjacent trades — concrete, masonry, framing, sheathing, water-resistive barriers, flashings. C. Coordination: Verify that openings, anchors, embeds, sealant joints, and water-resistive barrier terminations are installed and inspected before window installation begins. 3.4 EXAMINATION A. Examine openings, substrates, and structural support for compliance with manufacturer's requirements. Verify rough openings are plumb, square, and within manufacturer's tolerances. B. Verify continuity of water-resistive barrier (WRB) and air barrier at the rough opening. C. Proceed only after unsatisfactory conditions have been corrected. 3.5 PREPARATION A. Clean opening surfaces immediately before installation. Remove dust, debris, and loose particles. B. Apply primers and sealant tapes per manufacturer instructions where required. 3.6 ADJUSTING A. Adjust operating sashes, hardware, and accessories for smooth, leak-proof operation. B. Replace defective work that cannot be successfully repaired. 3.7 CLEANING AND PROTECTION A. Remove labels, dirt, and excess sealant from finished surfaces using methods recommended by manufacturers. B. Provide temporary protection against staining, scratching, and construction damage. Remove at Substantial Completion. 3.8 DEFICIENCY PROCEDURES A. Document deficiencies in the project OAC log. Coordinate with General Contractor on corrective action. B. Investigate any water infiltration following AAMA 511 forensic procedures. END OF SECTION
Compliant systems on file
Every Florida Product Approval (FL PA) number below has been hand-verified against the official source — floridabuilding.org Product Approval portal — and links to the source URL inline. Miami-Dade NOA cells marked ‘pending verification’ require a separate portal session that ACG runs at bid time. Expiration and design pressure are not displayed on the public-facing FPA portal; both appear inside the linked approval PDFs.
| Manufacturer | System / Category | FL PA # | Miami-Dade NOA # | Expiration | Source |
|---|---|---|---|---|---|
| ESWindows (Tecnoglass) | Windows / Projected | FL22046-R3 | pending verification | see source PDF | portal |
| ESWindows (Tecnoglass) | Windows / Casement | FL28670-R2 | pending verification | see source PDF | portal |
| ESWindows (Tecnoglass) | Windows / Single Hung | FL32032-R2 | pending verification | see source PDF | portal |
| ESWindows (Tecnoglass) | Windows / Horizontal Slider | FL36963-R3 | pending verification | see source PDF | portal |
| ESWindows (Tecnoglass) | Windows / Single Hung | FL46587-R1 | pending verification | see source PDF | portal |
| ESWindows (Tecnoglass) | Windows / Horizontal Slider | FL47086 | pending verification | see source PDF | portal |
| ESWindows (Tecnoglass) | Windows / Single Hung | FL47137 | pending verification | see source PDF | portal |
| PGT | Windows / Single Hung | FL239-R30 | pending verification | see source PDF | portal |
| PGT | Windows / Horizontal Slider | FL242-R35 | pending verification | see source PDF | portal |
| PGT | Windows / Fixed | FL243-R30 | pending verification | see source PDF | portal |
| PGT | Windows / Casement | FL245-R17 | pending verification | see source PDF | portal |
| PGT | Windows / Mullions | FL261-R15 | pending verification | see source PDF | portal |
| PGT | Windows / Casement | FL330-R25 | pending verification | see source PDF | portal |
| PGT | Windows / Single Hung | FL1435-R28 | pending verification | see source PDF | portal |
| PGT | Windows / Horizontal Slider | FL1844-R30 | pending verification | see source PDF | portal |
| PGT | Windows / Awning | FL2329-R18 | pending verification | see source PDF | portal |
| PGT | Windows / Projected | FL2766-R19 | pending verification | see source PDF | portal |
| PGT | Windows / Fixed | FL5012-R28 | pending verification | see source PDF | portal |
| PGT | Windows / Double Hung | FL7058-R23 | pending verification | see source PDF | portal |
| PGT | Windows / Double Hung | FL14705-R9 | pending verification | see source PDF | portal |
| PGT | Windows / Mullions | FL17519-R10 | pending verification | see source PDF | portal |
| PGT | Windows / Single Hung | FL29698-R7 | pending verification | see source PDF | portal |
| PGT | Windows / Horizontal Slider | FL29699-R9 | pending verification | see source PDF | portal |
| PGT | Windows / Fixed | FL29700-R5 | pending verification | see source PDF | portal |
| PGT | Windows / Awning | FL29701-R3 | pending verification | see source PDF | portal |
| PGT | Windows / Casement | FL29702-R3 | pending verification | see source PDF | portal |
| PGT | Windows / Double Hung | FL29704-R3 | pending verification | see source PDF | portal |
| Aldora | Windows / Fixed | FL27051-R7 | pending verification | see source PDF | portal |
| Aldora | Windows / Fixed | FL35263-R2 | pending verification | see source PDF | portal |
| Aldora | Windows / Casement | FL41347-R5 | pending verification | see source PDF | portal |
| Aldora | Windows / Mullions | FL47181 | pending verification | see source PDF | portal |
| Aldora | Windows / Single Hung | FL47195-R2 | pending verification | see source PDF | portal |
| Aldora | Windows / Casement | FL47343 | pending verification | see source PDF | portal |
| Aldora | Windows / Awning | FL47344 | pending verification | see source PDF | portal |
| Aldora | Windows / Horizontal Slider | FL48101 | pending verification | see source PDF | portal |
Full reference: see the ACG NOA & FL PA Hub for every authorized manufacturer’s approvals in one place.
Coordination & lead-time considerations
Lead time on this section depends on factory backlog, glass make-up, and finish. ACG quotes project-specific lead time in writing on every bid, sourced from the most recent factory acknowledgement on the proposed system — not from a published average. For complex assemblies (HVHZ + thermal break + custom finish), expect the bid to include a project-specific submittal schedule that runs from issued shop drawings through factory release. Coordination items to confirm with the General Contractor before submittal: rough opening tolerances, perimeter sequence (WRB transition, flashings, structural anchor path), and any sequence-dependent items downstream (interior finishes, MEP rough-in around the opening).
Related ACG resource
For ACG’s services page on this scope, including project examples and bid-ready capabilities, see Impact Windows & Doors.