ACG Scope Intelligence Engine

Define your glazing scope. Two minutes. No phone call required.

Answer a handful of questions about your commercial glazing scope. The engine returns the recommended system, code requirements, and a realistic install timeline — benchmarked against ACG's Florida project history and current building code. For pricing, request an itemized bid.

Florida HVHZ & statewide Storefront · Curtainwall · Impact · Multi-slide CGC #1531993
Step 1 of 6

What kind of commercial project?

Pick the closest match. Drives system recommendation and the per-SF base.

Step 2 of 6

How tall is the building?

Height drives both the recommended system and the install cost factor (high-rise needs unitized, cranes, and sequencing).

Step 3 of 6

How big is the scope?

Pick whichever you actually know. They all work — the engine converts to system area in the background.

5,000
system SF

Counts framing + glass together, not vision-glass only. Most accurate input the engine accepts.

Step 4 of 6

Where is the project?

Florida HVHZ + wind speed varies wildly by county. Picking the right region applies the right code framing and cost factor.

Step 5 of 6

Special requirements?

Pick any that apply. Each affects the system specification and scope.

Step 6 of 6 · optional

Glass makeup tier?

If you've talked to a designer about a specific tier, pick it. Otherwise leave the default — the engine picks per region and project type.

Running the engine…

Cross-referencing FL code, system catalog, and ACG bid history.

ACG Scope Intelligence Engine — Scope Report

Scope summary · your project
Recommended scope & system
SF system area (estimated)
 
This engine returns a recommended system, glass make-up, code requirements, and a realistic timeline. It does not generate pricing. For an itemized bid, ACG reviews plans, elevations, and the scope — request one below.

Recommended system

What ACG would put on this scope based on what you told us.
Why this system

Realistic install timeline

Phases from contract award to final punch. Real durations, scaled by SF, height, and code-cycle risk.

Code requirements for this region

What you'll see on the permit drawings + submittals.
    Get your branded PDF scope report

    Email this full breakdown to your team.

    We'll send you a printable PDF version + a copy lands with our estimating team for follow-up. No phone tag, no spam — just a clean record of what you scoped + a real human on standby.

    Or skip the form —

    Assumptions behind this number

    What this estimate includes — and what it doesn't.
      Full disclaimer. The ACG Scope Intelligence Engine returns a recommended system, glass make-up, code requirements, and a realistic timeline based on the inputs you provide, ACG's recent Florida project history, and current Florida Building Code. It does not generate pricing. It is not a bid, not a quote, not a contract, and not a guarantee of price or availability. Real bids require sealed drawings, elevations, a site walk, and a confirmed scope letter, and ACG returns line-item pricing on that basis. Multi-slide and folding-door systems are sized per unit or linear foot — send a real takeoff for that scope. Calibrated against ACG's project history as of 2026 and Florida Building Code 8th Edition (2023). Reach out at (772) 486-7711 or [email protected] for a bid.