Pre-qualification, on one sheet.

Licensing, insurance, bonding, safety, and code compliance — everything a GC pre-qualification team needs to clear ACG, with the documents downloadable below.

License FL CGC #1531993 GL $1M / $2M Safety OSHA 30-trained crews COI 24-hr turnaround
Sheet Q-101 · Licensing & registrations

Licensed to build in Florida.

LIC-01
CGC #1531993
FL CGC #1531993
LIC-02
FL Corporation
American Commercial Glass, Inc. · Sunbiz P21000018259 · NAICS 238150 (Glass and Glazing Contractors) · FEIN on request.
LIC-03
SAM.gov
Federal registration in process — positioning for federal and institutional glazing scopes.
Sheet Q-201 · Insurance schedule

Coverage that clears GC subcontract requirements.

ACG maintains commercial general liability, automobile, workers’ compensation, and umbrella coverage. Certificates of insurance are issued to project-specific additional insureds within 24 hours of award.

INS-01
General Liability — $1M / $2M
Per occurrence / general aggregate · $2M products-completed operations aggregate.
INS-02
Automobile — $1M CSL
Combined single limit · any auto.
INS-03
Workers’ Comp — $1M / $1M
Each accident / disease limit · statutory Florida coverage.
INS-04
Umbrella / Excess
Carried · limits shown on the COI and available on request.
INS-05
Carriers
Southern-Owners · Progressive · Sirius — A-rated carriers. Broker: Patriot Growth (Alexis Serrano).
INS-06
Sample COI — 24-hr turnaround
Download the sample certificate of insurance (PDF). Project-specific additional insureds within 24 hours of award.
Sheet Q-301 · Bonding

Bondable on the projects that require it.

Performance & payment

Bonds provided

ACG maintains an active surety relationship and provides performance and payment bonds on projects that require them.

Prequalification

Capacity letter on request

Current bond capacity letters and financial statements are available to pre-qualifying GCs and owners during prequalification.

Download

Letter of Bondability (PDF)

The current letter from ACG’s surety agent, downloadable now. For financials or a W-9, email connor@acglass.com.

Sheet Q-401 · Safety general notes

Safety is a precondition, not a bonus.

OSHA 30-trained crews

ACG fields OSHA 30-trained field crews with documented training records. EMR available on request.

Written program

Every crew runs an OSHA-compliant written safety program: site-specific job hazard analyses, fall-protection plans, and weekly toolbox talks.

GC-attested performance

“Met and exceeded our safety program” — RD Britton, Senior Project Manager, West Construction (Eau Palm Beach Resort). Full letter downloadable below.

Documented, not claimed

Safety records, training documentation, and OSHA logs are produced during prequalification — ask for what your risk team needs.

Sheet Q-501 · Third-party validation

Scored. Vetted. On the record.

COMPASS by Bespoke Metrics

Q Score 2.6 — Strong

Pre-qualified on COMPASS, the GC prequalification standard used across Florida commercial construction. All three pillars — Business, Finance, Health & Safety — rated strong. Report (PDF) →

2025 recognition

Select Top Subcontractor

2025 Select Top Subcontractor designation from COMPASS by Bespoke Metrics.

GC reference

West Construction letter

“Attention to detail, quality, and safety” — RD Britton, SPM, West Construction, on the Eau Palm Beach Resort scope. Letter (PDF) →

Sheet Q-601 · Ownership & company

Owner-operated. Woman-owned.

Leadership
Ownership

Woman-owned

Rielly Walsh, CEO and co-founder, is the 51% majority owner.

President

Connor Walsh

President and co-founder — the person who prices and runs your bid.

Founded

February 18, 2021

Florida corporation founded in West Palm Beach. Offices in WPB, Naples, and Tampa — Nashville, TN opens Q3 2026.

Bids

48-hour turnaround

Documented scopes get a detailed proposal or budget direction back within 48 hours — with an exclusions list, not surprises.

Sheet Q-701 · Code & compliance

Florida Building Code. Product approvals. NOA.

Every ACG-installed opening is engineered, submitted, and inspected against the governing Florida Building Code, including High-Velocity Hurricane Zone requirements in Miami-Dade and Broward. Current product approvals and NOAs available on request for every manufacturer we install.

CodeFlorida Building Code (FBC) · HVHZ Miami-Dade NOA · Broward County
ApprovalsFlorida Product Approval · DP ratings verified +/-
TestingASTM E330 / E283 / E547 · AAMA 501.4
Life safetyUL fire-rated assemblies · ADA — ICC A117.1
Impact-rated storefront band on the Haines City Public Safety Complex and EOC facade, installed by ACG Haines City Public Safety & EOC · Risk Category IV
Sheet Q-801 · Manufacturer relationships

Authorized on two lines. Fluent in seven.

All manufacturer partners
Authorized installer

ESWindows (Tecnoglass)

Authorized commercial installer — impact storefronts, window wall, and curtain wall from the NYSE-listed Tecnoglass factory.

Authorized installer

Euro-Wall

Authorized installer for impact folding, multi-slide, and pivot glass wall systems — factory certified.

Systems we install

PGT · Allegion · TGP · Slimpact · Aldora

Installed and coordinated to each project’s spec — TGP fire-rated glazing, Allegion hardware, PGT and Slimpact impact systems, and Aldora institutional framing.

Need the full pre-qual packet?

Bonding letter, W-9, COI samples, financials, and named references — available to qualifying GCs and owners within one business day.

Request the packet