Florida Commercial Glazing Service

Occupied building glazing installation Florida - retrofit and re-glaze

ACG performs commercial glazing installation on occupied Florida buildings - hotel partial-occupancy re-glaze, office building floor-by-floor IGU replacement, medical office occupied-facility re-glaze, restaurant after-hours storefront swap, school summer-break re-glaze. Phased install, weather protection, dust mitigation, egress maintenance, ICRA where required.

What occupied-building scopes does ACG handle?

Hotel curtain wall reskin during partial occupancy. Office building IGU replacement floor-by-floor. Restaurant storefront after-hours. Medical office punched-opening replacement room-by-room. School re-glaze during summer break. Each scope phased to maintain occupancy.

What protections do tenants need during occupied-building glazing?

Negative-pressure containment for indoor air quality. Weather protection during open-frame periods (rain, wind, salt-air exposure). Acoustic dampening on chiseling and rebar cutting. Dust mitigation for HVAC return air. Egress maintained per Florida Fire Prevention Code. Documented in pre-construction occupied-building plan.

Need emergency commercial glass response?

Call (772) 486-7711

Tenant-in-place: unit-by-unit access and protection plan (template)

Use one row per unit or work zone. This is an operational template, not a medical ICRA document and not a project record.

Unit / zoneAccess windowNotice to occupantInterior protectionWeather / open-frame planEgress maintained?Sign-off
Unit ###Date / hoursHours of notice per lease/GC rulesFloor/wall/HVAC returns as neededSame-day close / temp panelYes / planGC / owner
Corridor / shared
Lobby / entryAfter-hours?
ICRA caveat: Infection-control risk assessment protocols apply only where the facility type and owner/GC require them (commonly certain healthcare settings). Do not paste a full ICRA into every residential or office job.

Daily turnover checklist

  • Units opened today match the notice list
  • Protection in place before demolition of glass
  • Openings closed or weather-protected before leaving the floor
  • Dust and debris paths controlled away from HVAC returns as planned
  • Condition photos for completed units filed the same day
  • Occupant issues logged and escalated to the GC