Commercial Storefront Installation in West Palm Beach.
ACG installs commercial storefront systems for ground-floor retail, restaurants, and commercial buildings in West Palm Beach, Palm Beach County. Storefront installation for ground-floor retail, restaurants, and commercial buildings. Aluminum framing, single-source glazing, code-compliant submittal package. $66-$142 per SF installed in West Palm Beach. CGC #1531993.
Commercial Storefronts in West Palm Beach, FL.
West Palm Beach storefront work. West Palm Beach commercial storefront projects in 2026 cover ground-floor retail in mixed-use buildings, restaurant entries with operating glass envelopes, and standalone commercial buildings ranging from professional offices to medical and institutional uses. ACG bids storefront systems for West Palm Beach general contractors and restaurant operators with the full Division 08 scope: aluminum framing, single-source glazing, hardware coordination, and complete submittal documentation.
System selection in West Palm Beach. West Palm Beach commercial storefronts require Florida Product Approval (FL#) documentation with design pressure ratings appropriate for the exposure category. ACG specifies storefront systems with the design pressure (DP) rating and exposure category appropriate for the West Palm Beach site — typically Exposure C. We source from manufacturers with current Florida documentation and direct factory engineering support.
Lead time and pricing in West Palm Beach. Commercial storefront lead times run 10-16 weeks from approved shop drawings, with 3-7 days of field installation for a standard 30-foot storefront. Pricing in West Palm Beach runs $66-$142 per square foot installed for the all-in scope including material, labor, NOA or FL# documentation, and local building department submittal package. West Palm Beach oceanfront and direct-coastal sites run at the upper end of the range due to elevated design pressure requirements.
Code, NOA, and submittal discipline.
West Palm Beach is outside HVHZ but Florida Building Code Section 1709 still requires Florida Product Approval (FL#) documentation on every commercial storefront. ACG submittal packages include FL# documentation, glass make-up specification, hardware spec, and engineer-stamped shop drawings where the project requires.
West Palm Beach permit and inspection. ACG handles permit submittal coordination with the GC and the West Palm Beach building department. We pull the NOA or FL# documentation current at submittal, align the shop drawings with the approved configuration, and document the field installation against the installation instructions with a photo log. The result: West Palm Beach commercial storefront installations close out at certificate of occupancy without surprise items at the building department.
Manufacturer relationships. ACG is an authorized installer for the commercial storefront product lines we specify, with direct factory engineering support on configuration selection, design pressure, and NOA or FL# documentation. We do not bid a storefront system and then quietly substitute a less-rated competitor product at fabrication time. The product the architect specified is the product we install.
Delivered in West Palm Beach.
Common questions, answered.
Full Division 08 scope in West Palm Beach.
All-Glass Entrances — West Palm Beach
$4,500-$18,000 per opening. ACG installer in West Palm Beach.
Hurricane Impact Windows & Doors — West Palm Beach
$78-$195 per SF. ACG installer in West Palm Beach.
Glass Railings — West Palm Beach
$145-$385 per LF. ACG installer in West Palm Beach.
West Palm Beach commercial storefronts?
48-hour bid response.
ACG installs commercial storefronts for general contractors, restaurant operators, hospitality groups, and developers across West Palm Beach and the rest of South Florida. Send plans, a BuildingConnected invite, or a scope description and our team will have a bid back within 48 hours. CGC #1531993. $3M/$6M bonding.