Send Us Plans
GC Resource / Prequalification Reference

Glazing Subcontractor Prequalification - Sample Packet

What this is. A working template Florida GCs can use to prequalify glazing subcontractors before bid invitation. Sections mirror AIA A305 with HVHZ-specific additions. ACG meets every line item.

Section 1 - Identity and Licensing

For the company that bids this scope in Florida, see the page for a Florida commercial glazing subcontractor.

FieldWhat to verify
Legal entity nameMatch Florida Division of Corporations record (sunbiz.org)
FEINW-9 on file, dated within 12 months
Florida licenseCGC or CGI active, verified on myfloridalicense.com
Years under current licenseLapses or transfers flagged
Qualifying agentNamed individual, license tied to the entity
DBPR disciplinary historyPast 5 years - any settled complaints or formal action

Section 2 - Bonding

FieldWhat to verify
Surety nameTreasury Listing (Department of Treasury Circular 570) confirmed
A.M. Best ratingA- or better preferred
Single-project limitMinimum 3× project value
Aggregate limitMinimum 6× project value
Date of letterWithin 90 days
Producer / agencyNamed, with direct contact for verification

Section 3 - Insurance

CoverageRequired minimumVerify
General Liability$1M / $2MPer occurrence / aggregate; products-completed ops included
Excess / Umbrella$5M (or $10M on $5M+ projects)Follow-form over GL, auto, employers liability
Workers CompensationStatutory FLFlorida coverage; no contracting state exclusions
Auto$1M CSLHired and non-owned included
Additional InsuredPrimary, non-contributoryGC, owner, lender named on ongoing and completed ops
Waiver of subrogationIn favor of GC, owner, lenderOn GL, auto, WC
Notice of cancellation30 days writtenEndorsement on COI

Section 4 - Financial Capacity

  • Two most recent year-end financial statements (CPA-reviewed or compiled at minimum; audited for projects $5M+)
  • Current ratio > 1.2
  • Working capital sufficient to support 2× monthly burn on subject project
  • Bank reference letter, dated within 90 days
  • Tax compliance - Florida sales tax and corporate filings current

Section 5 - Safety

  • Three most recent years EMR - preferably below 1.0; below 0.85 is strong
  • OSHA 300 / 300A logs for the past three calendar years
  • OSHA incident history, lost-time incidents, fatalities
  • Written site-specific safety plan
  • OSHA 30 (PM, super) and OSHA 10 (field) certifications
  • Drug-free workplace policy

Section 6 - Product and Code Compliance (HVHZ-specific)

  • Miami-Dade NOA list for products carried - current, not expired
  • Florida Product Approval numbers cross-referenced to FBC current edition
  • TAS 201 / 202 / 203 familiarity (installer trained on cyclic and impact testing standards)
  • Engineering interface - Florida-registered PE for site-specific calcs when required
  • Anchor and substrate calculations methodology

Section 7 - Manufacturer Systems Installed

For ACG, the manufacturer systems installed and coordinated are:

  • ESWindows installer
  • Euro-Wall installer
  • PGT installer
  • Allegion hardware installer
  • TGP fire-rated framing installer
  • Slimpact installer

ACG installs these products; ACG does not claim authorized-dealer status for them. For any bidder, ask for current documentation and verify directly with the manufacturer when the spec requires it.

Section 8 - Experience and References

  • List of five most recent completed commercial projects, with dollar size, GC, owner, completion date
  • List of current projects in progress, with completion forecast
  • Three GC references, contact name + email + phone, within the past 24 months
  • Three architect references on similar scope and complexity
  • Any project terminated or removed from past 5 years - disclosure with reason

Section 9 - Field and Office Capacity

  • Named project manager assigned, with concurrent project count disclosed
  • Named superintendent assigned, with concurrent project count disclosed
  • Self-perform versus subcontracted breakdown by trade
  • Crew sourcing - direct employee versus 1099 versus labor broker
  • Office location closest to project site, and travel logistics

Frequently Asked Questions

What is glazing subcontractor prequalification?

The vetting process a GC or owner runs before inviting a glazing sub to bid. Covers license, bonding, insurance, financials, safety, references, and manufacturer credentials.

What documents are required?

License, bond letter, COI, two most recent year-end financials, OSHA 300 logs, EMR letter, project list, three references, manufacturer certifications, safety plan, and quality plan.

How often should glazing subcontractors re-prequalify?

Annual recertification. Bond letters and COIs typically every six months or before each award.

What is AIA A305?

AIA's Contractor's Qualification Statement - a standardized prequalification form covering license, bonding, financials, references, completed projects, and litigation history.

How does ACG meet these standards?

FL CGC #1531993; performance and payment bonds on projects that require them, with bond capacity letters available during prequalification; GL, workers' comp, auto, and umbrella insurance; OSHA 30 trained field crews; installer for ESWindows and Euro-Wall; Florida operations; named PM + superintendent per project.

Need ACG's current prequalification packet for your GC bid list? Request it directly and a complete packet will be returned within 24 hours.

Request the ACG Prequalification Packet