Treat the pocket as architecture and waterproofing work, not empty wall space.

Pocketing Glass Walls: Space and Waterproofing Connor Walsh · 2026-09-12 · /blog/pocketing-glass-walls-space-waterproofing.html

Product pages may mention pocket stacking in passing. This article is about pocket construction and serviceability: room for panels, keeping water out of the pocket, and getting back in after the drywall is closed.

What a pocketing wall is asking for

A pocketing operable wall stacks panels into a side or end pocket so the clear opening can feel uninterrupted. The pocket is part of the building: framing, finishes, waterproofing, and sometimes MEP clearances. If the pocket is drawn as empty space only, the field invents depth and gets stuck panels or wet interiors.

Space and stacking clearances

  • Confirm panel thickness, quantity, and stacking side from the manufacturer layout for that opening mark
  • Provide pocket depth and width per manufacturer minimums for that configuration (do not invent clear widths here)
  • Keep furniture, host stands, and POS out of the stack envelope on restaurant plans
  • Coordinate door swings and egress paths with the stacked condition, not only the open condition

Related operating tradeoffs live on folding vs multi-slide for restaurants.

Waterproofing the pocket

Pockets sit where exterior weather and interior finishes meet. Treat them like a miniature room that must shed water:

  • Show continuous waterproofing / pan strategy at the pocket floor and jambs on enlarged details
  • Keep interior finishes from damming weep paths
  • Coordinate exterior cladding so water does not drain into the pocket cavity
  • Seal penetrations for track supports and any electrical if automatic operators are used

Maintenance access

After opening day, someone must clean tracks, adjust rollers, and replace weather seals. Design access:

  • Removable pocket panel or access door sized for service, not only for install day
  • Lighting in or adjacent to the pocket if it is deep
  • Clear path for a tech without dismantling millwork
  • Owner turnover notes for who services the hardware under warranty vs after warranty

Pocket coordination checklist

TEMPLATE ONLY. Not a product sales sheet. Not invented clear widths.

Item Ready? Notes
Manufacturer stacking layout Y / N Opening mark specific
Pocket depth / width per docs Y / N From manufacturer, not assumed
Waterproofing enlarged detail Y / N Floor / jambs / cladding lap
Service access designed Y / N Removable panel / door
Furniture / POS clear of stack Y / N FF&E plan check
Shop drawings Approved / AAN Y / N Before fab release

How to ask for the right scope

Send elevations, the opening schedule, and an enlarged pocket plan/section (even if schematic). Ask bidders to confirm pocket dimensions against the manufacturer layout. Mark material-only or furnish-and-install.

ACG works from West Palm Beach, Naples, and Tampa. Call (772) 486-7711. FL CGC #1531993.

Frequently Asked Questions

Is a pocket just empty wall space?

No. It is a designed cavity with stacking clearances, waterproofing, finishes, and service access. Empty space on a plan is not a pocket detail.

Who owns pocket waterproofing?

Assign it early. Architect owns design intent. Waterproofing and finish trades often build the cavity. Glazing sub owns the operable system per approved shops. Exact contract assignment is project-specific [UNCERTAIN]

Can I invent pocket depth from panel count?

Do not. Use manufacturer layout minimums for the exact configuration. This article does not publish invented clear widths.

What should I send with the RFQ?

Elevations, opening schedule, pocket plan/section intent, and material-only vs furnish-and-install.

Related Resources
Euro-Wall Overview → Euro-Wall Hub → Folding vs Multi-Slide → Flush Thresholds →
SEND THE DRAWINGS

Pocketing the stack?
Draw the cavity before buyout.

Send elevations, the opening schedule, and a pocket plan/section. Mark material-only vs furnish-and-install. (772) 486-7711. FL CGC #1531993.

Send Us Plans
Pricing this scope?

Send us the drawings. Scope letter back in 48 hours.

American Commercial Glass bids operable glass-wall packages with pocket coordination for Florida restaurants and hospitality. Send elevations, the opening schedule, and pocket intent.

Licensed Florida glazing subcontractor · FL CGC #1531993 · West Palm Beach · Naples · Tampa

Send us plans → (772) 486-7711