Harbour Cay II
A 17,200 SF coastal retail center on South Beach in Fort Pierce — ACG delivered the complete ESWindows storefront glazing package, ground up, for Mason Development & Construction.
Beachside retail, glazed end to end.
Harbour Cay II is a 17,200 SF coastal neighborhood retail center on South Beach in Fort Pierce — built from the ground up on 3.1 acres near the public beach. The center brings a strong tenant mix to one of the Treasure Coast's most active beachside corridors: Dunkin', Island Pig & Fish, NYC Subs, Viet Bowl, Goodfellas Pizza and Hershey's Ice Cream, among others.
A beachside retail center has to look right. The storefront glazing ties the whole facade together — clean aluminum framing, consistent sightlines across every tenant bay, and glass that holds up to salt air, UV and South Florida's storm exposure. ACG delivered the complete glazing package for the entire center.
Built for Mason Development & Construction — a Palm Beach-based commercial construction firm specializing in retail, healthcare and tenant improvement projects. Harbour Cay II is one of their signature ground-up developments on the Treasure Coast.
Around the center.
Ground-up retail, every bay on one standard.
Every bay, one standard
Full storefront scope for every tenant bay, every entrance and every piece of glass across the 17,200 SF center — consistent frame profiles and sightlines throughout.
Impact-rated ESWindows
ESWindows product was spec'd throughout, delivering impact-rated storefront framing and glass that meets the Treasure Coast's wind and debris code requirements.
Rough opening to final punch
Ground-up retail means coordinating with the GC on every bay while multiple tenant improvements run simultaneously. ACG managed the scope from submittals through closeout.
More retail and Treasure Coast work.
Have plans? Send them to Connor directly.
Retail centers, multi-tenant plazas, ground-up storefronts — upload drawings and bid-date info, and a scoped proposal or budget direction comes back in 48 hours.