The project.
Westlake Hialeah Retrofit is located in Hialeah, Miami-Dade County, Florida. Existing Hialeah multifamily impact retrofit. The development was led by Westlake Hialeah. SISCA served as general contractor.
The site sits within Miami-Dade County jurisdiction, which enforces Miami-Dade HVHZ. Commercial glazing scopes in this jurisdiction are designed for 175+ mph design pressure, with Miami-Dade Notice of Acceptance (NOA) required. ACG's commercial glazing license (FL CGC #1531993) and active product approval listings cover the Hialeah market.
ACG's scope.
The glazing package on Westlake Hialeah Retrofit included window retrofit. ACG specified, supplied, and installed PGT impact retrofit — manufactured by ACG's seven approved partner lines: ESWindows, Euro-Wall, PGT, Allegion, TGP, Slimpact, and Aldora.
The scope was sequenced to SISCA's field schedule, with weekly coordination meetings, RFI turn-around inside 24 hours, and submittals tracked against the construction critical path. ACG's three-office Florida footprint (West Palm Beach HQ, Naples, Tampa) keeps a project supervisor within driving distance of every active job site, and the Hialeah location pulled supervision out of our West Palm Beach office.
Why Hialeah.
Why this matters for the Hialeah market. Westlake Hialeah Retrofit is not just another envelope. Existing Hialeah multifamily impact retrofit. Subcontractors who deliver here build a body of evidence GCs and developers can verify — first-pass inspection clearance, on-time turnover, accurate submittals, no callback claims. Those four metrics are how a glazing sub gets called back, and they are the entire reason ACG was selected for this scope.
For developers and GCs evaluating subcontractors for similar work in Hialeah or surrounding Miami-Dade County, Westlake Hialeah Retrofit is on our portfolio precisely because it represents the standard of execution we hold across every project, regardless of size. The 350-square-foot Waxin's storefront on Clematis Street and the 60,000 SF Panther National clubhouse run on the same field discipline.
"The Hialeah project is in our portfolio because the work is correct. We don't put projects on the page that we couldn't put a GC on the phone with."
See it on the portfolio.
The full project page for Westlake Hialeah Retrofit includes the visual gallery, system specifications, GC and architect credits, and the timeline of milestones. The project sits inside ACG's 350+ project portfolio, alongside hospitality, healthcare, multifamily, retail, and institutional work across Florida.
For more on the systems used here, see ACG's pages on commercial storefront systems or impact windows and doors.
More from ACG's multifamily portfolio.
Send your plans to ACG.
We'll have a scoped bid back within 48 hours. Same supervision, same standard, every project.
Send Plans →American Commercial Glass · FL CGC #1531993 · West Palm Beach · Naples · Tampa · [email protected] · (772) 486-7711